Brookvale Mall Redevelopment Plans Raise Housing and Infrastructure Questions

Brookvale’s proposed Warringah Mall redevelopment remains under state planning assessment, with differing housing figures and infrastructure commitments outlined across the plans being considered for the shopping centre and surrounding precinct.



The redevelopment was among the housing proposals discussed during a demonstration outside NSW Parliament on Wednesday, 21 October 2026. Around 100 people attended the gathering organised by Save Our Suburb (SOS) Mona Vale, which primarily focused on housing density and infrastructure concerns in Pittwater.

Although the demonstration centred on Mona Vale, the proposed scale of development at Warringah Mall was also raised, bringing attention to the separate planning approaches being considered for Brookvale.

Different Proposals For Warringah Mall

NBC’s comparison published on 19 August 2026 outlines two different development scenarios for Warringah Mall. NBC’s proposal provides for approximately 850 dwellings, with buildings reaching 25 storeys. Its comparison records shopping centre operator Scentre Group’s separate proposal as accommodating up to 1,600 dwellings, with a maximum height of 39 storeys.

The proposals also differ in their affordable housing provisions. NBC has proposed 10 per cent affordable housing in perpetuity, compared with five per cent for 15 years under Scentre Group’s proposal. Different arrangements for public open space and community facilities are also outlined.

The Brookvale mall redevelopment is being considered through the NSW State Significant Development process under application SSD-83464714. The NSW Planning Portal describes a concept involving 1,500 dwellings across eight development blocks, including 350 dwellings in the detailed first stage.

Earlier consultation material published by Scentre Group describes 310 apartments in the initial stage, with a longer-term development program allowing for up to 1,600 dwellings. The different figures appear in documents prepared at different stages of the planning process. The available information does not establish whether subsequent revisions account for the differences.

Road Upgrades And Transport Capacity

Infrastructure requirements are another component of the proposed redevelopment. Scentre Group’s project consultation material identifies approximately $50 million in proposed public infrastructure improvements, including road connections, pedestrian and cycling facilities, and stormwater works.

The developer has also outlined contributions towards improvements at the Cross Street and Pittwater Road intersection. A complete, independently verified funding arrangement and delivery timetable for the proposed works have not been established in the available planning information.

NBC’s wider Brookvale Precinct Planning Proposal includes new road connections, public open spaces, community facilities and improvements to walking and cycling infrastructure. The precinct proposal identifies approximately 2,900 additional homes across Brookvale by 2041. The figure covers the broader precinct and is separate in scope from the housing totals proposed for the Warringah Mall site.

Public transport improvements are also being considered through the Northern Beaches Network Review, while NBC has identified additional B-Line services among its transport priorities. The regional review does not establish specific funded transport upgrades for the mall redevelopment.



At the planning status check on 3 November 2026, Scentre Group’s application remained at the Prepare EIS stage, before formal public exhibition. No confirmed exhibition commencement date had been established. NBC’s separate precinct proposal was referred to the NSW Department of Planning, Housing and Infrastructure following its July 2026 resolution. Both proposals remain subject to their respective planning assessment processes.

Published 23-October-2026

Updated 3-November-2026

Allambie Road Among Pothole Hotspots as Repair Methods Face Review

Allambie Road has been named among Northern Beaches roads affected by potholes as councillors consider alternatives to temporary patching. Northern Beaches Council repaired more than 9,000 potholes across its road network in the 12 months to June.



Council weighs longer-lasting pothole treatments

Cr Vincent De Luca is seeking a review of pothole repair materials and techniques used by other Australian councils and road authorities. His proposal asks staff to examine more durable options, including full-depth asphalt patching and polymer-modified asphalt.

Northern Beaches Council says temporary pothole repairs can cost between $30 and $200 per hole, depending on the location and work required. Interim repairs are used to keep damaged roads safe before longer-term treatment is undertaken, while recurring failures can lead to heavier patching or resurfacing.

Questions about the durability of temporary repairs have previously been raised with the council. In September 2025, De Luca asked about repairs failing after rainfall and whether more cost-effective long-term methods had been investigated.

Photo Credit: Northern Beaches Council

Wet weather adds pressure to damaged roads

Council has said prolonged rain can allow water to enter cracks in road surfaces, weakening pavement as traffic continues to pass over affected areas. During a wet period in 2025, 1,568 potholes were recorded between July and August, with 1,355 made safe.

Longer-term treatments used across the Northern Beaches include crack sealing, microsurfacing, heavy patching and road resurfacing. Additional funding from the council’s Special Variation to rates has supported road maintenance and renewal projects across the Northern Beaches, including works in several suburbs where potholes have been reported.

McIntosh Road moves to major pavement works

McIntosh Road between Dee Why and Narraweena has drawn particular attention after repeated pothole complaints. Council has said about $1.5 million will be spent on the worst-affected section, including pavement strengthening, kerb and gutter replacement and resurfacing.

A separate Australian Government project listing for McIntosh Road records an estimated project cost of $1.25 million and describes the pavement as affected by cracks, potholes and patches.

Broader renewal work is continuing across the area. Council reported $1.41 million in road resurfacing during April across Bayview, Beacon Hill, Dee Why, Narraweena and North Balgowlah.

ConnectSydney separately completed about 532 pothole repairs on contracted state roads in the Northern Beaches local government area from January 2025.



Residents can report council-road damage to Northern Beaches Council, while potholes on state roads including Warringah, Pittwater and Mona Vale roads are handled through the NSW Government.

Published 27-Aug-2026

Brookvale Named in Council’s Push to Reinstate Alcohol-Free Zones

Brookvale will return to alcohol-free zone status after ongoing reports of street drinking and antisocial behaviour led Northern Beaches Council to prioritise new restrictions. The decision follows a peninsula-wide review, with support from police, rangers, and locals ahead of its proposed start in September 2025. Community feedback is open until Sunday, 27 April, through the council’s “Your Say” website or by written submission.



Community Impact and the Brookvale Decision

Brookvale’s alcohol-free zone expired in 2023, but continued public drinking—especially near Pittwater Road and Warringah Mall bus stops prompted its return, with police data and council patrols confirming ongoing alcohol-related disturbances.

Photo Credit: Google Maps

The decision means people will no longer be allowed to drink alcohol on public roads, footpaths, laneways, and carparks within the designated Brookvale zone. Police and rangers will have the authority to seize opened alcohol containers if someone is drinking or appears about to drink in a restricted area.

What the Review Covered

Brookvale was one of 19 alcohol-free zones reviewed by Northern Beaches Council in a region-wide assessment designed to streamline timelines and apply consistent rules. 

The review used police data, complaints, and community input to guide changes, some zones, like Avalon and Newport, were adjusted, while others, including Belrose and Cromer, will be removed due to fewer incidents and reduced concern.

Council confirmed the changes won’t affect licensed outdoor dining, parks or beaches, as alcohol-free zones apply only to road-related areas, aiming to keep shared public spaces safer for families and commuters.

How Residents Can Have Their Say

Northern Beaches Council is seeking community feedback on the proposed zones until Sunday, 27 April 2025, via its “Your Say” website or by written submission.

Residents are encouraged to read the full summary of assessments available online, which outlines the reasons for each zone’s status. In Brookvale’s case, the decision was shaped heavily by safety concerns and the push from authorities to prevent a repeat of past issues.

The Broader Picture

The review reflects ongoing efforts to balance safety and public access, with Brookvale highlighting the challenges of managing alcohol in busy hubs with transport, nightlife, and public facilities.



By returning the suburb to an alcohol-free status, officials hope to prevent late-night disturbances and make key parts of Brookvale more comfortable for everyone. The proposed changes reflect not only policy but also years of community input and policing efforts.

Published 17-April-2025